I-75 RAMP over M-9073 SPRING STREET

IN ATLANTA · County 121, Georgia · Built 1983 · 1 Lanes · 6,805 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012105480
Year Built
1983
Length
25.6 m (84 ft)
Max Span
25.6 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$239,000
Total Project Cost
$358,000