I-75 HOV RAMPS over I-75 SBL

IN ATLANTA · County 121, Georgia · Built 1983 · 2 Lanes · 6,420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105440
Year Built
1983
Length
138.7 m (455.1 ft)
Max Span
62.5 m
Width
20 m (65.6 ft)
Lanes
2
Daily Traffic
6,420
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,778,000
Total Project Cost
$2,667,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.