ALEXANDER STREET over M-9073 TECHWOOD-SPRG C

IN N. W. ATLANTA · County 121, Georgia · Built 1983 · 3 Lanes · 3,690 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012105630
Year Built
1983
Length
25.3 m (83 ft)
Max Span
25.3 m
Width
20.2 m (66.3 ft)
Lanes
3
Daily Traffic
3,690
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$413,000
Total Project Cost
$619,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.