RMP I-285 CBL-I-20 over I-285 CCBL (SR 407)

IN W ATLANTA · County 121, Georgia · Built 1965 · 1 Lanes · 21,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102550
Year Built
1965
Reconstructed
1982
Length
56.7 m (186 ft)
Max Span
25.6 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
21,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$529,000
Total Project Cost
$793,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.