I-285 CBL over M-9045 COLLIER DRIVE

IN W ATLANTA · County 121, Georgia · Built 1964 · 5 Lanes · 165,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102380
Year Built
1964
Reconstructed
1982
Length
41.1 m (134.8 ft)
Max Span
17.1 m
Width
26.9 m (88.3 ft)
Lanes
5
Daily Traffic
165,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$959,000
Total Project Cost
$1,439,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.