I-285 CCBL over M-9045 COLLIER DRIVE
IN W ATLANTA · County 121, Georgia · Built 1964 · 4 Lanes · 138,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.7679, -84.494089
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 62 years old.
Nearby Bridges
I-285 CBL over M-9045 COLLIER DRIVE
Built 1964
I-285 over SANDY CREEK
Built 1964
I-20 over I-285- I-285 RAMP
Built 1965
RMP I-285 CBL-I-20 over I-285 CCBL (SR 407)
Built 1965
RMP I-285 CCBL-I-2 over RMP I-20W TO I-285 CCBL
Built 1966
RMP I-20W-I-285CCB over I-285 CBL
Built 1965
I-20 EBL over RMP I-20W TO I-285 CCBL
Built 1966
RMP I-20 TO SR 139 over I-285 (SR 407)
Built 1979
RMP I-285 CCBL-I-2 over I-285 CBL (SR 407)
Built 1966
FAIRBURN ROAD over I-20
Built 1963
Bridge Details
- Structure #
- 000000012102390
- Year Built
- 1964
- Reconstructed
- 1982
- Length
- 34.7 m (113.8 ft)
- Max Span
- 16.2 m
- Width
- 21 m (68.9 ft)
- Lanes
- 4
- Daily Traffic
- 138,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $688,000
- Total Project Cost
- $1,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.