RMP I-285 CCBL-I-2 over I-285 CBL (SR 407)

IN W ATLANTA · County 121, Georgia · Built 1966 · 1 Lanes · 16,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102530
Year Built
1966
Reconstructed
1982
Length
63.7 m (209 ft)
Max Span
27.1 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
16,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$594,000
Total Project Cost
$891,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.