BROWNS BRIDGE ROAD over TWO MI CRK (LAKE LANIER)

9.1 MI NE OF CUMMING · County 117, Georgia · Built 2019 · 2 Lanes · 14,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000011750570
Year Built
2019
Length
170.7 m (560 ft)
Max Span
42.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
14,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$49,728,000
Total Project Cost
$74,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.