BOLLING BRIDGE over CHESTATEE R (LK LANIER)

FORSYTH-HALL CO LINE · County 117, Georgia · Built 2018 · 2 Lanes · 18,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011750550
Year Built
2018
Length
300.2 m (984.9 ft)
Max Span
73.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
18,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$87,468,000
Total Project Cost
$131,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.