US 19 (NBL) - SR 3 over DRY CREEK
0.8 MI N OF MITCHELL C.L. · County 095, Georgia · Built 1959 · 2 Lanes · 10,700 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.453886, -84.118144
This bridge is in worse condition than 94% of bridges in County 095. The average bridge in Georgia is 0 years old; this one is 67 years old.
Nearby Bridges
US 19 (SBL) - SR 3 over DRY CREEK
Built 1959
US 19- SR 3 over DRY CREEK TRIB
Built 1957
RADIUM SPRINGS ROA over DRY CREEK
Built 1990
NELMS ROAD over DRY CREEK
Built 1971
US 19- SR 300 over FLINT RIVER TRIB
Built 1960
OLD HIGHWAY 3 over FLINT RIVER TRIB
Built 1921
GRAVEL HILL ROAD over DRY CREEK OVERFLOW
Built 1955
GRAVEL HILL ROAD over DRY CREEK
Built 1955
GRAVEL HILL ROAD over FLINT RIVER OVERFLOW
Built 1952
US 19- SR 300 over FLINT RIVER TRIB
Built 1960
Bridge Details
- Structure #
- 000000009500640
- Year Built
- 1959
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 10,700
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $469,000
- Total Project Cost
- $703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.