US 19- SR 300 over FLINT RIVER TRIB
APP 2 MI N OF JCT SR 93 · County 205, Georgia · Built 1960 · 4 Lanes · 10,700 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.424533, -84.12795
This bridge is in worse condition than 45.9% of bridges in County 205. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
OLD HIGHWAY 3 over FLINT RIVER TRIB
Built 1921
US 19- SR 3 over DRY CREEK TRIB
Built 1957
RADIUM SPRINGS ROA over DRY CREEK
Built 1990
US 19 (NBL) - SR 3 over DRY CREEK
Built 1959
US 19 (SBL) - SR 3 over DRY CREEK
Built 1959
US 19- SR 300 over FLINT RIVER TRIB
Built 1960
OLD HIGHWAY 3 over FLINT RIVER TRIB
Built 1921
NELMS ROAD over DRY CREEK
Built 1971
STAGE COACH ROAD over RACCOON CREEK
Built 1968
US 19- SR 300 SBL over RACCOON CREEK
Built 1960
Bridge Details
- Structure #
- 000000020500590
- Year Built
- 1960
- Reconstructed
- 1978
- Length
- 14.3 m (46.9 ft)
- Max Span
- 3.4 m
- Lanes
- 4
- Daily Traffic
- 10,700
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $284,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.