US 19- SR 3 over DRY CREEK TRIB

0.3 MI N OF MITCHELL C.L. · County 095, Georgia · Built 1957 · 4 Lanes · 10,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000009500630
Year Built
1957
Length
10.1 m (33.1 ft)
Max Span
2.1 m
Lanes
4
Daily Traffic
10,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$199,000
Total Project Cost
$299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.