GRAVEL HILL ROAD over DRY CREEK OVERFLOW

APP 7 MILES SOUTH EAST OF · County 095, Georgia · Built 1955 · 2 Lanes · 650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009500710
Year Built
1955
Reconstructed
2001
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
650
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.