THIRD DISTRICT ROA over SOUTH PRONG CREEK
2.7 MI S OF UNADILLA · County 093, Georgia · Built 1977 · 2 Lanes · 170 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.226558, -83.714006
This bridge is in worse condition than 38.4% of bridges in County 093. The average bridge in Georgia is 0 years old; this one is 49 years old.
Nearby Bridges
FIVE POINTS ROAD over SOUTH PRONG CREEK
Built 1965
ARENA ROAD over SOUTH PRONG CR TRIB
Built 1965
I-75 over SOUTH PRONG CREEK TRIB
Built 1961
I-75 over NFS RAILROAD
Built 1961
I-75 over SR 7 (US 41) EXIT 120
Built 1961
SR 230 over CAMP CREEK TRIB.
Built 1989
PINEHURST ROAD over I-75 @ 116.63 (EXIT 117)
Built 1961
EAST RAILROAD ST. over CAMP CREEK
Built 1983
SR 230 over I-75 @121.52 (EXIT 122)
Built 1961
US 41 / SR 7 over CAMP CREEK
Built 1928
Bridge Details
- Structure #
- 000000009300510
- Year Built
- 1977
- Length
- 24.4 m (80.1 ft)
- Max Span
- 6.1 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 170
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $313,000
- Total Project Cost
- $469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.