I-75 over NFS RAILROAD

UNADILLA-SOUTHSIDE · County 093, Georgia · Built 1961 · 6 Lanes · 55,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000009300370
Year Built
1961
Reconstructed
1994
Length
60.4 m (198.2 ft)
Max Span
20.1 m
Width
43.9 m (144 ft)
Lanes
6
Daily Traffic
55,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,618,000
Total Project Cost
$2,426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.