SR 230 over I-75 @121.52 (EXIT 122)
UNADILLA-WESTSIDE · County 093, Georgia · Built 1961 · 2 Lanes · 1,180 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.260528, -83.749428
This bridge is in worse condition than 80.8% of bridges in County 093. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
I-75 over CAMP CREEK
Built 1961
I-75 over SR 7 (US 41) EXIT 120
Built 1961
US 41 / SR 7 over CAMP CREEK
Built 1928
I-75 over NFS RAILROAD
Built 1961
EAST RAILROAD ST. over CAMP CREEK
Built 1983
COUNTY LINE ROAD over I-75 @ 123.76
Built 1961
US 41 over BIG CREEK TRIB.
Built 1961
I-75 over SOUTH PRONG CREEK TRIB
Built 1961
ARENA ROAD over SOUTH PRONG CR TRIB
Built 1965
I-75 NBL over SR 7 (US 41)
Built 1963
Bridge Details
- Structure #
- 000000009300280
- Year Built
- 1961
- Length
- 67.7 m (222.1 ft)
- Max Span
- 22.9 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,180
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $867,000
- Total Project Cost
- $1,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.