I-75 over SR 7 (US 41) EXIT 120
UNADILLA-SOUTHSIDE · County 093, Georgia · Built 1961 · 6 Lanes · 55,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.247247, -83.743431
This bridge is in worse condition than 38.4% of bridges in County 093. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
I-75 over NFS RAILROAD
Built 1961
SR 230 over I-75 @121.52 (EXIT 122)
Built 1961
I-75 over CAMP CREEK
Built 1961
EAST RAILROAD ST. over CAMP CREEK
Built 1983
US 41 / SR 7 over CAMP CREEK
Built 1928
I-75 over SOUTH PRONG CREEK TRIB
Built 1961
ARENA ROAD over SOUTH PRONG CR TRIB
Built 1965
THIRD DISTRICT ROA over SOUTH PRONG CREEK
Built 1977
COUNTY LINE ROAD over I-75 @ 123.76
Built 1961
SR 230 over CAMP CREEK TRIB.
Built 1989
Bridge Details
- Structure #
- 000000009300390
- Year Built
- 1961
- Reconstructed
- 1994
- Length
- 38.7 m (127 ft)
- Max Span
- 15.2 m
- Width
- 53.5 m (175.5 ft)
- Lanes
- 6
- Daily Traffic
- 55,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,038,000
- Total Project Cost
- $1,556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.