I-75 MANAGED LANES over ELIZABETH BRANCH
IN EAST MARIETTA · County 067, Georgia · Built 2018 · 2 Lanes · 225,340 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.973567, -84.531853
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 8 years old.
Nearby Bridges
ALLGOOD ROAD over I-75
Built 1974
ALLGOOD ROAD over SOPE CREEK
Built 1955
I-75 over SOPE CREEK
Built 1967
I-75 MANAGED LANES over SR 5-CANTON RD-GA NE RR
Built 2016
CANTON ROAD over SR 3 (US 41)
Built 2013
CANTON ROAD over I-75 + (3) I-75 RAMPS
Built 1973
SR 5 (NBL) over I-75 + (1) I-75 RAMP
Built 1974
SR 5 (NBL) over I-75 + (1) I-75 RAMP
Built 1985
MERRITT ROAD over SOPE CREEK TRIB
Built 1992
SR 5 (SBL) over I-75 + (1) I-75 RAMP
Built 1974
Bridge Details
- Structure #
- 000000006753450
- Year Built
- 2018
- Length
- 15.8 m (51.8 ft)
- Max Span
- 15.8 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 225,340
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,588,000
- Total Project Cost
- $6,882,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.