I-75 MANAGED LANES over SR 5-CANTON RD-GA NE RR

IN NORTH MARIETTA · County 067, Georgia · Built 2016 · 2 Lanes · 9,999 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753200
Year Built
2016
Length
1785.8 m (5858.9 ft)
Max Span
43.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
9,999
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$520,220,000
Total Project Cost
$780,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.