SR 5 (NBL) over I-75 + (1) I-75 RAMP

2 MI N OF MARIETTA · County 067, Georgia · Built 1985 · 1 Lanes · 13,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006701850
Year Built
1985
Length
120.7 m (396 ft)
Max Span
34.1 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
13,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.