CANTON ROAD over SR 3 (US 41)
1.6 MI N OF MARIETTA · County 067, Georgia · Built 2013 · 2 Lanes · 7,840 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.976269, -84.547394
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 13 years old.
Nearby Bridges
SR 5 over SR 3 (US 41)
Built 1985
SR 5 over M-9019 + CSX RR (351808J
Built 1985
I-75 MANAGED LANES over SR 5-CANTON RD-GA NE RR
Built 2016
CANTON ROAD over I-75 + (3) I-75 RAMPS
Built 1973
SR 5 (NBL) over I-75 + (1) I-75 RAMP
Built 1985
SR 5 (NBL) over I-75 + (1) I-75 RAMP
Built 1974
SR 5 (SBL) over I-75 + (1) I-75 RAMP
Built 1974
SR 5 (NBL) over SR 5 SPUR
Built 1985
OLD HWY 41 over CSX RAILROAD (340397A)
Built 2021
I-75 MANAGED LANES over DICKSON ROAD
Built 2017
Bridge Details
- Structure #
- 000000006753140
- Year Built
- 2013
- Length
- 45.7 m (149.9 ft)
- Max Span
- 45.7 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 7,840
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,320,000
- Total Project Cost
- $19,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.