I-285 RAMP over I-285 RMP TO I-75 NBL

0.2 MI E OF JCT I-75 · County 063, Georgia · Built 1959 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300450
Year Built
1959
Reconstructed
1984
Length
34.7 m (113.8 ft)
Max Span
12.5 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
6,805
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.