I-75 RAMP over I-75

0.05 MI SE OF ATL AIRPORT · County 063, Georgia · Built 1985 · 1 Lanes · 9,590 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006301010
Year Built
1985
Length
94.8 m (311 ft)
Max Span
34.4 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
9,590
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.