SR 85 (SBL) over I-75 (SBL RAMP)

0.2 MI S OF JCT I-75 · County 063, Georgia · Built 1977 · 1 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300160
Year Built
1977
Length
82.9 m (272 ft)
Max Span
48.2 m
Width
9.7 m (31.8 ft)
Lanes
1
Daily Traffic
12,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.