I-285 (WBL RAMP) over I-75

0.05 MI SE OF ATL AIRPORT · County 063, Georgia · Built 1986 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300460
Year Built
1986
Length
99.1 m (325.1 ft)
Max Span
34.4 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.