US 19 / SR3 over I-285 & (2) I-285 RAMPS

0.67 MI E OF I-75 · County 063, Georgia · Built 1983 · 8 Lanes · 28,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006300050
Year Built
1983
Length
108.2 m (355 ft)
Max Span
20.7 m
Width
34.8 m (114.2 ft)
Lanes
8
Daily Traffic
28,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.