HARTLEY BRIDGE ROA over I-75 (EXIT 155 @155.47)

4 MI. S. MACON · County 021, Georgia · Built 2006 · 6 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002150510
Year Built
2006
Length
119.5 m (392.1 ft)
Max Span
35.1 m
Width
29.8 m (97.8 ft)
Lanes
6
Daily Traffic
19,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,202,000
Total Project Cost
$4,804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.