HARTLEY BRIDGE RAM over I-75 SBL

5 MI. S. OF MACON C.L. · County 021, Georgia · Built 2008 · 1 Lanes · 4,160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002150540
Year Built
2008
Length
91.7 m (300.9 ft)
Max Span
26.8 m
Width
15 m (49.2 ft)
Lanes
1
Daily Traffic
4,160
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$855,000
Total Project Cost
$1,283,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.