I-75 RAMP TO 475 N over I-75 NBL

2 MI. SOUTH MACON C.L. · County 021, Georgia · Built 2008 · 1 Lanes · 4,160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002150550
Year Built
2008
Length
91.7 m (300.9 ft)
Max Span
34.7 m
Width
15 m (49.2 ft)
Lanes
1
Daily Traffic
4,160
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,176,000
Total Project Cost
$1,764,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.