I-75 (NBL) over TOBESOFKEE CREEK

3 MI S OF MACON · County 021, Georgia · Built 1970 · 3 Lanes · 39,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100730
Year Built
1970
Reconstructed
1995
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
39,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.