I-75 over M-3208 ANTHONY ROAD
IN SE MACON · County 021, Georgia · Built 1970 · 6 Lanes · 70,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.820039, -83.655792
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 56 years old.
Nearby Bridges
ELL STREET over I-75 @ MILEPOST 162.24N
Built 1970
A"" STREET over ROCKY CREEK TRIB
Built 1970
SR 74 over I-75 (EXIT163)@162.91
Built 1970
US 80/SR 22 over I-75 (EXIT 162) @162.06
Built 1970
US 80 over ROCKY CREEK TRIB
Built 1968
HIGHTOWER ROAD over I-75 @ 161.88
Built 1970
HIGHTOWER ROAD over ROCKY CREEK TRIB.
Built 1967
STADIUM DRIVE over I-75 @163.19
Built 1970
MONTPELIER AVE. over I-75 @ 163.48N
Built 1970
NAPIER AVE. over I-75 @ 163.60
Built 1970
Bridge Details
- Structure #
- 000000002100880
- Year Built
- 1970
- Reconstructed
- 1995
- Length
- 50.3 m (165 ft)
- Max Span
- 21.3 m
- Width
- 34.7 m (113.8 ft)
- Lanes
- 6
- Daily Traffic
- 70,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,348,000
- Total Project Cost
- $2,022,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.