MONTPELIER AVE. over I-75 @ 163.48N

IN EAST MACON · County 021, Georgia · Built 1970 · 2 Lanes · 4,430 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100420
Year Built
1970
Length
69.8 m (229 ft)
Max Span
21.6 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
4,430
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$895,000
Total Project Cost
$1,342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.