US 41 RAMP over I-75 RAMP TO I-16 EAST

IN EAST CENTRAL MACON · County 021, Georgia · Built 2019 · 2 Lanes · 4,840 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002150820
Year Built
2019
Length
112.2 m (368.1 ft)
Max Span
19.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
4,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,708,000
Total Project Cost
$49,062,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.