US 41 BUS SBL/SR 1 over I-75 (EXIT 164) @164.02

IN EAST CENTRAL MACON · County 021, Georgia · Built 1968 · 3 Lanes · 10,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100170
Year Built
1968
Length
61.6 m (202.1 ft)
Max Span
17.7 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
10,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.