ELL STREET over I-75 @ MILEPOST 162.24N

IN SE MACON · County 021, Georgia · Built 1970 · 2 Lanes · 2,060 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002101640
Year Built
1970
Length
86 m (282.2 ft)
Max Span
29.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
2,060
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,102,000
Total Project Cost
$1,653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.