US 80/SR 22 over I-75 (EXIT 162) @162.06
IN SE MACON · County 021, Georgia · Built 1970 · 4 Lanes · 22,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.814083, -83.656008
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 56 years old.
Nearby Bridges
US 80 over ROCKY CREEK TRIB
Built 1968
ELL STREET over I-75 @ MILEPOST 162.24N
Built 1970
A"" STREET over ROCKY CREEK TRIB
Built 1970
HIGHTOWER ROAD over I-75 @ 161.88
Built 1970
HIGHTOWER ROAD over ROCKY CREEK TRIB.
Built 1967
I-75 over M-3208 ANTHONY ROAD
Built 1970
I-75 over ROCKY CREEK TRIB
Built 1969
I-75 over M-3244 NEWBURG AVE.
Built 1970
SR 74 over I-75 (EXIT163)@162.91
Built 1970
STADIUM DRIVE over I-75 @163.19
Built 1970
Bridge Details
- Structure #
- 000000002100260
- Year Built
- 1970
- Length
- 80.8 m (265.1 ft)
- Max Span
- 24.1 m
- Width
- 30.9 m (101.4 ft)
- Lanes
- 4
- Daily Traffic
- 22,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,600,000
- Total Project Cost
- $2,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.