US 41 over NS RAILROAD
SW MACON @ JCT SR 19 · County 021, Georgia · Built 1976 · 4 Lanes · 15,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.841947, -83.662372
This bridge is in worse condition than 41.2% of bridges in County 021. The average bridge in Georgia is 0 years old; this one is 50 years old.
Nearby Bridges
NAPIER AVE. over I-75 @ 163.60
Built 1970
I-75 over CS 367 OGLETHORPE ST
Built 1967
MONTPELIER AVE. over I-75 @ 163.48N
Built 1970
I-75 over TOWN CREEK
Built 1967
US 41 BUS SBL/SR 1 over I-75 (EXIT 164) @164.02
Built 1968
US 41 BUS NBL/SR 1 over I-75 (EXIT 164)@164.12
Built 1968
STADIUM DRIVE over I-75 @163.19
Built 1970
US 41 RAMP over I-75 RAMP TO I-16 EAST
Built 2019
SHARON DRIVE over ROCKY CREEK TRIB
Built 1950
SR 74 over I-75 (EXIT163)@162.91
Built 1970
Bridge Details
- Structure #
- 000000002100600
- Year Built
- 1976
- Reconstructed
- 2020
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 19.7 m (64.6 ft)
- Lanes
- 4
- Daily Traffic
- 15,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $543,000
- Total Project Cost
- $815,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.