COBURN/APEX ROAD over MAIN C CANAL
0.3 MI SOUTH OF SR-780 · County 115, Florida · Built 2001 · 3 Lanes · 4,557 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
27.336583, -82.440808
This bridge is in worse condition than 66.9% of bridges in County 115. The average bridge in Florida is 0 years old; this one is 25 years old.
Nearby Bridges
Fruitville Farms S over Drainage Canal
Built 2024
FRUITVILLE RD over PALMER CANAL
Built 1967
Side Road over ORANGE CREEK
Built 1970
INITIATIVE BLVD over MAIN C CANAL
Built 2021
I-75 NB (SR-93) over SR-780 (FRUITVILLE RD)
Built 1979
I-75 SB (SR-93) over SR-780 (FRUITVILLE RD)
Built 1979
PALMER BLVD. over CENTRAL POND
Built 1999
PALMER BLVD. over MAIN C CANAL
Built 1999
I-75 NB over PALMER BLVD.
Built 1979
I-75 SB over PALMER BLVD.
Built 1979
Bridge Details
- Structure #
- 174105
- Year Built
- 2001
- Length
- 9.7 m (31.8 ft)
- Max Span
- 9.7 m
- Lanes
- 3
- Daily Traffic
- 4,557
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.