PALMER BLVD. over CENTRAL POND

0.4MI EAST OF APEX RD. · County 115, Florida · Built 1999 · 2 Lanes · 6,700 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
174096
Year Built
1999
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Lanes
2
Daily Traffic
6,700
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.