I-75 SB over PALMER BLVD.

0.9 MI SOUTH OF SR-780 · County 115, Florida · Built 1979 · 3 Lanes · 127,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
170081
Year Built
1979
Length
41.5 m (136.2 ft)
Max Span
18.3 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
127,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.