I-75 NB over PALMER BLVD.

0.9 MI SOUTH OF CR-780 · County 115, Florida · Built 1979 · 3 Lanes · 139,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
170082
Year Built
1979
Reconstructed
2007
Length
41.5 m (136.2 ft)
Max Span
18.3 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
139,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.