THOMPSON NURSERY over PEACE CREEK DRAIN CANAL

0.2MI WEST OF US-27 · County 105, Florida · Built 1976 · 2 Lanes · 6,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
164338
Year Built
1976
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.