US-27 (SR-25) over PEACE CREEK SLOUGH

2.4 MI. SOUTH OF SR-540 · County 105, Florida · Built 1958 · 6 Lanes · 41,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
160150
Year Built
1958
Reconstructed
2004
Length
6.4 m (21 ft)
Max Span
3.2 m
Lanes
6
Daily Traffic
41,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.