SR-60 EB over PEACE CREEK RELIEF
4.1 MI WEST OF US-27 · County 105, Florida · Built 1965 · 2 Lanes · 13,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
27.904686, -81.663161
This bridge is in worse condition than 73% of bridges in County 105. The average bridge in Florida is 0 years old; this one is 61 years old.
Nearby Bridges
SR-60 WB over PEACE CREEK RELIEF
Built 1951
CR-653 over PEACE CREEK CANAL
Built 1992
OLD BARTOW LK WALE over PARTS DITCH
Built 2014
W LAKE WALES ALTUR over PEACE CREEK DRAIN
Built 1960
SR-60 EB over PEACE CREEK DRAIN CANAL
Built 2001
SR-60 WB over PEACE CREEK DRAIN CANAL
Built 2001
OLD BARTOW/LK WALE over PEACE CREEK CANAL
Built 1998
CREWS ROAD over PEACE CREEK DRAIN
Built 1955
Logistics Pkwy over PEACE CREEK CANAL
Built 2014
US-27 (SR-25) over CSXT RR
Built 2008
Bridge Details
- Structure #
- 160133
- Year Built
- 1965
- Length
- 48.8 m (160.1 ft)
- Max Span
- 6.1 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 13,000
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.