SR-60 over US-27 (SR-25)

SR-60 at US-27 · County 105, Florida · Built 2022 · 6 Lanes · 20,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
160359
Year Built
2022
Length
80.5 m (264.1 ft)
Max Span
80.5 m
Width
27.4 m (89.9 ft)
Lanes
6
Daily Traffic
20,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.