I-75 NB TO I-4 EB over US-92 (SR-600)

0.4MI SOUTH OF I-4 · County 057, Florida · Built 1983 · 2 Lanes · 21,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100422
Year Built
1983
Length
62.5 m (205.1 ft)
Max Span
35 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
21,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.