I-4 EB TO I-75NB over I-4

I-4 & I-75 INTERCHANGE · County 057, Florida · Built 1984 · 1 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100428
Year Built
1984
Length
96.8 m (317.6 ft)
Max Span
47.2 m
Width
9.5 m (31.2 ft)
Lanes
1
Daily Traffic
12,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.