I-75 NB over I-4 AND RAMP C-1

I-75 & I-4 INTERCHANGE · County 057, Florida · Built 1984 · 3 Lanes · 83,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100394
Year Built
1984
Length
145 m (475.7 ft)
Max Span
30.8 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
83,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.