I-75 NB (SR-93A) over I-75 NB TO I-4 WB

0.1 MI NORTH OF I-4 · County 057, Florida · Built 1983 · 3 Lanes · 78,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
100396
Year Built
1983
Length
50.3 m (165 ft)
Max Span
24.4 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
78,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.