I-75 SB TO I-4 over SLIGH AVENUE

I-4 & I-75 INTERCHANGE · County 057, Florida · Built 1985 · 1 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
100430
Year Built
1985
Reconstructed
2019
Length
71 m (232.9 ft)
Max Span
35.7 m
Width
14.3 m (46.9 ft)
Lanes
1
Daily Traffic
14,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.